Educational Building Construction Picture Album

Watch the progress of our Educational Building project!

Educational Building Construction Picture Album

Plans

This shows the total new construction in relationship to our current facilities.

Plans

Educational Addition/Mayflower Classes

The preschool - 7th grade classrooms are highlighted in this photo.

Educational Addition/Mayflower Classes

3-D Model Southwest View

3-D Model Southwest View

Slab Preparation on 4/23/09

Gravel and forms were in place on Thursday. Two sections were prepared for a pour on Friday - adult classrooms and the rotunda.

Slab Preparation on 4/23/09

Adult Classroom Slab 4/24/09

This space will be divided by a partition, making two adult classes when closed and fellowship hall overflow space when open.

Adult Classroom Slab 4/24/09

Finishing Rotunda Slab on 4/24/09

The rotunda will be a transitioning point from our worship center to the educational building. A colored concrete was poured that will be ground to an almost mirror polish. The rest of the area was prepared for a pour scheduled for Monday.

Finishing Rotunda Slab on 4/24/09

Pouring Concrete on 4/28/09

After a rainy Monday that delayed work, the slab was completed on Tuesday.

Pouring Concrete on 4/28/09

Pumping Concrete

Because of muddy conditions, a pumping truck was brought in to expedite the pour. Without moving the truck, it's boom was able to reach the outer limits of the building and complete the pour by late morning.

Pumping Concrete

Riding trowell for finishing concrete

Two riding trowells were used to give a smooth finish. These two skilled finishers intricately guided their machines through the plumbing and column connections.

Riding trowell for finishing concrete

Laying out the west wall 5/6/09

The framers, having already pre-cut quite a bit of lumber while waiting for the slab to cure, are busy assembling the walls.

Laying out the west wall 5/6/09

Steel Arrives 5/11/09

Workers offload the steel columns and beams.

Steel Arrives 5/11/09

Steel Columns 5/11/09

Steel columns begins to be set in place.

Steel Columns 5/11/09

Walls UP! 5/12/09

Framers begin to erect exterior walls.

Walls UP! 5/12/09

Architect Visit 5/14/09

Dave Laugerman, architect, inspects some drawings with a framer.

Architect Visit 5/14/09

Roof Column Installed 5/14/09

After cutting a big whole in the middle of the fellowship hall (old sanctuary) and roof, the column that will support the roof ridge beam was installed.

Roof Column Installed 5/14/09

Through the Roof 5/14/09

The column extends through the roof to support the Adult class ridge beam. By the end of the day the whole in the roof had a temporary patch.

Through the Roof 5/14/09

Adult Class Roof Beam Installed 5/14/09

Mayflower student inspect the huge beam that will support the roof for the Adult classrooms.

Adult Class Roof Beam Installed 5/14/09

Gas Main Relocated 5/19/09

Mark Eblen (in the pit) is among those who ran the new gas line under Townline.

Gas Main Relocated 5/19/09

Adult Classroom Framing 5/21/09

The walls begin to go up around the 800 sq feet area that will be adult classrooms and fellowship hall overflow.

Adult Classroom Framing 5/21/09

Old Blue

With windows removed, the old blue color scheme of the old sanctuary is revealed. Wow!

Old Blue

Adult Class Room Decking 6/3/09

With some rain delays the last week of May, the framers completed the adult classroom framing and trusses. A vented decking is being installed because of the vaulted ceiling.

Adult Class Room Decking 6/3/09

Shingles on the Adult Classrooms 6/4/09

Duane Laugerman (architect's brother) and worker shingle the new roof for the adult classrooms.

Shingles on the Adult Classrooms 6/4/09

Crane arrives to install roof panels 6/17/09

With the roof trusses in place, installation of the roof panels begins today!

Crane arrives to install roof panels 6/17/09

Rotunda Taking Shape 6/17/09

With metal studs in place, the quarter inch plywood in attached to form the rotunda.

Rotunda Taking Shape 6/17/09

Roofing Panels Installed 6/17/09

These roof panels have insulation sandwiched between plywood. A membrane will cover the roof when completed.

Roofing Panels Installed 6/17/09

Roofing Complete 6/23/09

With the roof panels in place, the roofing fabric was installed on Monday and Tuesday.

Roofing Complete 6/23/09

Adult Classes and Youth Room Roofed and Almost Enclosed 6/23/09

Adult Classes and Youth Room Roofed and Almost Enclosed 6/23/09

Brick Going Up 7/7/09

Brick Going Up 7/7/09

Youth Room Stage 7/7/09

Youth Room Stage 7/7/09